A check dam is a small barrier — rock, or wood with a stake — laid across a swale or channel. It steps one long slope into a flight of nearly flat pools, so water drops 8 inches at a dam instead of scouring 8 feet of grade. It is the cheapest way to put a swale on ground that is steeper than it likes.

Checked 2026-09-10 · figures re-verified against sources below

The spacing formula

Dams are spaced so the toe of one dam sits at the same elevation as the crest of the next one downhill. That geometry gives:

spacing = dam height ÷ channel grade

A 1-ft-high dam on a 4% grade: 1 ÷ 0.04 = 25 ft between dams. On 2% grade the same dam goes 50 ft. If your grade number came from an eyeball, the spacing is fiction — measure it.

Worked example

RunGradeDam heightSpacingDams per 100 ft
Side yard5%1 ft20 ft5
Back slope3%0.75 ft25 ft4
Long shallow run1.5%0.5 ft33 ft3

Steeper ground wants more dams and lower ones; a 2-ft dam on a 10% slope is a wall that will fail sideways. Keep dams under about 1.5 ft in yard channels.

What a dam does and does not do

  • It slows water; it does not store much. The pool behind a 1-ft dam is shallow and small. Dams make a steep swale survivable; they do not turn it into a pond.
  • It collects sediment — on purpose. That is the maintenance bill: the pool fills, the dam gets silt behind it, and someone must empty it. Budget for it or don't build dams.
  • It needs an armored spill point. Water goes over the middle; the middle washes first. Rock dams are their own armor. Wood dams need a stone pad on the downstream side.

Materials, honestly compared

Rock dams (6–12 in stone) survive freeze-thaw and mowing mistakes. Wood dams (pressure-treated timber staked through) are faster to build and look intentional, but rot at ground contact and walk downhill under frost. If you can carry the stone, carry the stone — sized like riprap.